My 1m x 0.8m IE build in the UK

New Home Forum Mostly Printed CNC – MPCNC Your Builds – MPCNC My 1m x 0.8m IE build in the UK

This topic contains 4 replies, has 4 voices, and was last updated by Profile photo of Chris Chris 1 year, 3 months ago.

Viewing 5 posts - 1 through 5 (of 5 total)
  • Author
    Posts
  • #9784
    Profile photo of John Wells
    John Wells
    Participant

    Finally moved mine out to the garage (it was sitting on the living room floor for a few weeks — the wife is pleased!).

    Haven’t milled anything yet — still testing and dialing it in (have drawn a few things with a Sharpie). I have a lot to learn about CNC milling first.

    The router is a Makita RT0700CX. I added the “MShoe” dust shoe, with a few pretty lights attached. It’s using 25mm chromed wardrobe rails (from Screwfix in the UK). They’re very thin walled but appear to be very rigid — let’s hope the chrome plating holds up.

    The spindle is controlled via a relay from the D9 fan output. The original relay was rated at 240V/10A, but the smell of ozone was overpowering. I’ve added an outboard relay box and am waiting for a beefier relay to arrive.

    Thank you very much for the fantastic design — can’t wait to get milling!

    Attachments:
    #9787
    Profile photo of tmelvin
    tmelvin
    Participant

    Looking good! Did you design the ramps/lcd case or where did you find it?

    #9795
    Profile photo of John Wells
    John Wells
    Participant

    Thanks! The main control panel is my design, but it’s just a couple of sheets of plastic with a few holes for switches and wires. It holds the PSU and relay. The LCD case is glued in top of that… it’s a design from thingiverse.

    The ramps case is mounted below, on the leg.

    #9799
    Profile photo of Ryan
    Ryan
    Keymaster

    So clean…..time to get it dirty…..

    #10965
    Profile photo of Chris
    Chris
    Participant

    Hi John
    I’m almost ready to build mine. just need 3 more printed feet and to buy the tubes.
    How are the rails holding up? I’m not sure to buy ali, conduit, or the rails like you have got.
    last shift tonight then 12 days off to get my build on lol
    Chris

Viewing 5 posts - 1 through 5 (of 5 total)